Skip To Page Content
Remodeling Contractor Vancouver WA

Interior Home Reconstruction from Water Damage in Vancouver, WA

Kitchen Vancouver WA

The Project

This project involved a major interior remodel aimed at repairing extensive water damage throughout a home in Vancouver, WA. The renovation encompassed multiple areas including flooring, base trim replacement, door installations, framing repairs, drywall work, and bathroom renovations.

At a Glance

Project Type

Water Damage Repair

Location

Vancouver, WA

Project Date

June 2024

Cost

Approximately $30,000

Project Details

  • Type: Water leakage repair work to most of the house.
  • Size: The repair done was to about 800 sq ft.
  • Materials: Luxury vinyl plank (LVP) and finger-jointed pine flooring, medium dense fiber (MDF) trim, and hollow core 3-panel interior doors.
  • Features: Brand new flooring, trim, drywall, doors, vanity, and more.
  • Benefits: This project was transformed from a house in shambles from the water damage and after the mitigation company removed a lot of the damage leaving the home in disarray into a completely revitalized home.

Project Type & Materials

Updates/Additions: The scope included replacing 800 square feet of flooring along with installing new base trim in the living room, kitchen, hallway, entryway, bathroom, laundry room, closet spaces, and dining room. We also replaced doors damaged by water, repaired framing, and renovated the bathroom.

Materials Used: Luxury vinyl plank (LVP) flooring was installed throughout, with medium dense fiber (MDF) trim in areas where there should be no moisture like the bedroom, hallway, and dining room and finger-jointed pine (real wood) in moisture-prone spaces like the bathroom and laundry room. Hollow core 3-panel interior doors were also used.

Features/Benefits

Client Communication: There was consistent and clear communication throughout the project, ensuring transparency and peace of mind for the client. I provide a price breakdown for all work done.

Detailed Oriented Approach: Mike demonstrated meticulous attention to detail, ensuring quality workmanship and client satisfaction.

Timely Completion: The project was completed in less than three weeks, providing a rapid turnaround despite the scope of work.

Quality Materials Used: Mike used finer-jointed pine in areas where there is a lot of moisture such as the bathroom and laundry room. This is real wood that is 100% waterproof and does not swell up or crack.

Before Project

Doors
Shower
Floors
Bedroom

Prior to the renovation, the home suffered from significant water damage:

  • Flooring, drywall, and trim were extensively damaged or missing.
  • A lot of removal work from the mitigation company, such as removing flooring, drywall, trim, shower, washer, dryer, vanity, etc.
  • The original flooring was ripped out in the hallway, bedroom, bathroom, laundry room and bedroom closet.
  • Structural issues such as dry rot required repair.
  • Essential fixtures like doors, vanity, and appliances were removed for mitigation purposes.

Challenges Faced

Several challenges arose during the project:

  • Unexpected dry rot and framing issues required additional repair work.
  • Initial mitigation efforts did not address all underlying structural damage, necessitating further intervention.

After Project

Doors Vancouver
Bathroom Vancouver
Bedroom Vancouver
Living Room Vancouver
Hallway Vancouver

Upon completion:

  • The home underwent a transformative change, with new flooring and trim enhancing aesthetic appeal and functionality.
  • The bathroom was fully restored and upgraded, eliminating previous water damage issues. It went from not functioning to being functional.
  • All doors were installed correctly, functioning smoothly and closing properly.

Project Length

Timeline: The project was finished in early June 2024, spanning less than three weeks.

Kitchen Vancouver

This case study showcases how a dedicated remodeling contractor in Vancouver, WA can successfully restore and upgrade a home, exceeding expectations with quality craftsmanship and client-focused service.

We successfully tackle significant obstacles to achieve a positive result.

Contact Us Today

Summary of Experience

The project concluded with high satisfaction from the client:

  • Despite challenges with initial insurance delays, the contractor delivered exceptional results promptly.
  • Positive feedback highlighted the contractor’s dedication to quality, meticulousness, and effective communication throughout the renovation process.

This case study showcases how a dedicated remodeling contractor in Vancouver, WA, successfully restored and upgraded a home, exceeding expectations with quality craftsmanship and client-focused service.

Jeannine Compton

“I am beyond pleased with the work that prestige construction, & home remodeling did for my home. Mike was very good at listening and understanding all I wanted done, him and James went above and beyond getting my home back together after a major water leak.. Mike & James kept me updated throughout my entire job..I would refer prestige construction, & home remodeling to everyone I know.”

Google Review

Posted on by Prestige Construction & Home Remodeling
Interior Home Reconstruction from Water Damage in Vancouver, WA

Comments are closed.

Explore Other Posts

|

Share:

Tumblr
Pin it